All three of these were delivered in buildings that stayed open. That is the part that takes the planning.

BlueBox air-cooled heat pump units on the plant deck at Leichhardt Park Aquatic Centre
ARBS 2026 finalist

Aquatic & leisure

Leichhardt Park Aquatic Centre

Stage 1 replaced the centre's thermal plant with a multifunctional four-pipe heat pump running on R290, a natural refrigerant. It does space cooling, space heating, pool water heating and domestic hot water at the same time, holding different setpoints across the site.

It is the largest application of its kind in Australia, and it shows a fossil-fuel plant can be replaced without giving up comfort or reliability. The centre stayed open throughout. Shortlisted at the ARBS Industry Excellence Awards 2026 for the Minor Project Excellence Award.

Location

Leichhardt, NSW

Sector

Aquatic & leisure

Refrigerant

R290, natural

Scope

Stage 1 thermal plant

Completed

2026

Recognition

ARBS 2026 finalist

Healthcare

Ryde Hospital, Ward 2

Upgrade and refurbishment of existing medical wards, including retrofitting and integrating HVAC into a live hospital.

Everything had to be staged around a working ward. Coordination with hospital staff and infection-control requirements shaped the programme more than the mechanical work did, and the disruption to patients and staff had to stay near zero.

Location

Ryde, NSW

Sector

Healthcare

Scope

CCHDU & outpatient upgrade

Placeholder drawing, awaiting photography of the Ryde Hospital ward upgrade
Placeholder drawing, awaiting photography of the Ashfield Civic Centre chiller upgrade

Civic

Ashfield Civic Centre

A chiller failed. We were brought in to get the building's cooling back, and the whole job was delivered inside a seven-day emergency window.

The ageing chillers came out and eight Mitsubishi Electric chillers went in. We modified and upgraded the existing building management system at the same time and added remote access to it. The building stayed fully occupied and operational the entire time, so the staging had to hold essential cooling while the plant was being swapped underneath it.

Location

Ashfield, NSW

Sector

Civic & community

Plant

8 × Mitsubishi Electric chillers

Programme

7 days, emergency

Scope

Chiller replacement, BMS upgrade

Get in touch

Got a plant room that needs looking at?

Tell us what the building is and what it's doing wrong. We'll come and have a look.